Project plan as bars by day, week or month, beside a task table or in lanes, with milestones and dependencies.
On this page
@addTagHelper *, Webority.Ui.Razor
Table layout
The default: a task table beside the bars, with each task's owner, dates and progress in columns.
A plan as a task table
Rows with a start and an end are bars; a row with only a start is a milestone. An arrow runs from each task to the tasks that start after it. Today is a line with a flag, and the status is written on each bar.
error holds the message to show. The wui-gantt:retry event fires when the reader presses Try again.
Launch plan, failed
Task
Start
End
Done
Status
Owner
Starts after
Show code
<app-gantt title="Launch plan" rows="@noRows" error="The plan did not load."></app-gantt>
Keep the view in the address
A reader's zoom, window and folds can sit in the address, so a shared link opens the same view. This is the consumer's code, not the component's.
Reading and writing the query string
Read the three values from the address on load and pass them to the tag, and write them back from the three change events. The component never touches the URL.
A link such as ?zoom=week&from=2026-10-26&folded=Discovery opens the plan that way.
Show code
<script>
var plan = document.querySelector("wui-gantt");
function keep(name, value) {
var url = new URL(location.href);
url.searchParams.set(name, value);
history.replaceState(null, "", url);
}
plan.addEventListener("wui-gantt:zoom-change", function (e) { keep("zoom", e.detail.zoom); });
plan.addEventListener("wui-gantt:from-change", function (e) { keep("from", e.detail.from); });
plan.addEventListener("wui-gantt:fold-change", function (e) { keep("folded", e.detail.folded.join(",")); });
</script>
Every option
Every value of every prop, one cell each.
rows: the tasks
rows="@tasks" with a start and an end, a milestone and dependencies
Plan
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
rows="@noRows" (the empty state)
Plan, no tasks
Task
Start
End
Done
Status
Owner
Starts after
layout: table, lanes
layout="AppGanttLayout.Table"
Plan, table
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
layout="AppGanttLayout.Lanes"
Plan, lanes
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
zoom: day, week, month
zoom="AppGanttZoom.Day"
Plan, day
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
zoom="AppGanttZoom.Week"
Plan, week
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
zoom="AppGanttZoom.Month"
Plan, month
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
from: the window's first day
from omitted (default: the window the zoom picks around today)
Plan, default window
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
from="2026-10-26"
Plan, from a day
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
folded: no phase, or one phase
folded omitted (default: none folded)
Plan, none folded
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
folded="@discoveryFolded" (a list holding "Discovery")
Plan, Discovery folded
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
selected: nobody, a task or null
selected omitted (default: no card)
Plan, no card
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
selected="api"
Plan, card open
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
selected="@noSelection" (null: no card, the same as omitted)
Plan, null
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
today: the day the Today line sits on
today="2026-11-17"
Plan, fixed today
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
state: ready, loading, empty, error
state="AppGanttState.Ready"
Plan, ready
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
state="AppGanttState.Loading"
Plan, loading
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
state="AppGanttState.Empty"
Plan, empty
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
state="AppGanttState.Error"
Plan, error
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
loading, error: the state flags
loading="true" (default: false)
Plan, loading
Task
Start
End
Done
Status
Owner
Starts after
error="The plan did not load."
Plan, error
Task
Start
End
Done
Status
Owner
Starts after
empty-text, error-text, loading-text: the state messages
empty-text="No work is planned yet."
Plan, empty text
Task
Start
End
Done
Status
Owner
Starts after
error-text="The plan is unavailable." (with error)
Plan, error text
Task
Start
End
Done
Status
Owner
Starts after
loading-text="Fetching the plan" (with loading)
Plan, loading text
Task
Start
End
Done
Status
Owner
Starts after
add-task, wui-gantt:retry: the buttons in the empty and error states
add-task="true" (empty state shows Add task)
Plan, add task
Task
Start
End
Done
Status
Owner
Starts after
error="…" (error state shows Try again, and fires wui-gantt:retry)
Plan, retry
Task
Start
End
Done
Status
Owner
Starts after
class: extra classes on the root
class="plan-extra"
Plan, class
Task
Start
End
Done
Status
Owner
Starts after
Stakeholder interviews
26-Oct-2026
06-Nov-2026
100%
Done
Ananya Iyer
Requirements sign-off
09-Nov-2026
13-Nov-2026
100%
Done
Rohit Verma
Stakeholder interviews
Scope frozen
13-Nov-2026
0%
Not started
Rohit Verma
Requirements sign-off
API contracts
16-Nov-2026
27-Nov-2026
60%
In progress
Meera Nair
Scope frozen
Portal screens
30-Nov-2026
18-Dec-2026
0%
Not started
Karan Malhotra
API contracts
Payment gateway integration
16-Nov-2026
04-Dec-2026
20%
At risk
Sneha Kulkarni
Scope frozen
Data migration from legacy ledger
23-Nov-2026
24-Dec-2026
10%
In progress
Imran Qureshi
UAT with branch teams
21-Dec-2026
31-Dec-2026
0%
Not started
Divya Menon
Portal screens, Data migration from legacy ledger
Go-live
04-Jan-2027
0%
Not started
Navneet Singh
UAT with branch teams
Guidance
What to do, and what to avoid.
Use it when
A project plan whose tasks have a start and an end date, where the reader needs to see what is due when, what waits on what and what is late.
Reach for something else when
Events on a month grid. → AppCalendar
A vertical history of what happened. → AppTimeline
A value series over time. → AppChart
Reference
Try every prop, read the full list, and check keyboard and screen reader behaviour.
21 props. The 5 most used come first.
Used on most screens 5 props
Prop
Type
Default
Description
rowsdefault -
AppGanttRow list
-
The tasks. A row with no StartDate is not drawn; a row with a StartDate and no EndDate is a milestone.
zoomdefault week
Day | Week | Month
week
The time scale: day, week or month. Controlled when given.
layoutdefault table
Table | Lanes
table
How the plan is drawn. table puts a task table (task, owner, start, end, done) beside the bars. lanes prints each name on its bar and opens a details card for a chosen bar.
fromdefault from the zoom and today
DateOnly
from the zoom and today
First day of the window, YYYY-MM-DD. Absent: the window the zoom picks around today. Controlled when given.
foldeddefault -
string list
-
The phase names that are folded to one summary bar.
Less common 16 props
Prop
Type
Default
Description
titledefault required
string
required
Names the plan for assistive technology and its exported files.
selecteddefault -
string
-
Key of the chosen row. The table layout highlights it; the lanes layout opens its details card. null chooses none. Controlled when given.
todaydefault today in India time
DateOnly
today in India time
Today, YYYY-MM-DD. Absent: today in Asia/Kolkata.
statedefault ready
Ready | Loading | Empty | Error
ready
ready draws the plan; loading, empty and error draw their own message.
loadingdefault false
bool
false
The plan is loading. Wins over state.
errordefault -
string
-
The curated message to show when the plan failed. Wins over loading and state.
empty-textdefault -
string
-
The message when there are no tasks. Defaults to the built-in copy.
error-textdefault -
string
-
The message under error when none is given. Defaults to the built-in copy.
loading-textdefault -
string
-
The text read aloud while the plan loads. Defaults to the built-in copy.
add-taskdefault false
bool
false
Draws the Add task button in the empty state.
wui-gantt:zoom-changedefault -
event
-
The scale changed. Its detail is { zoom }.
wui-gantt:from-changedefault -
event
-
The window moved. Its detail is { from }.
wui-gantt:fold-changedefault -
event
-
A phase was folded or unfolded. Its detail is { folded }.
wui-gantt:selectdefault -
event
-
A bar was opened or closed. Its detail is { key }, or null when the card closed.
wui-gantt:add-taskdefault -
event
-
The Add task button was pressed.
wui-gantt:retrydefault -
event
-
The Try again button was pressed.
AppGanttRow takes:
9 props.
Less common 9 props
Prop
Type
Default
Description
Keydefault required
string
required
Unique in the list. Other rows name it in DependsOn.
Namedefault required
string
required
The label printed on the bar.
StartDatedefault -
DateOnly
-
The first day of the bar, or the day of a milestone.
EndDatedefault -
DateOnly
-
The last day of the bar, inclusive. Left out makes the row a milestone.
Progressdefault 0
int
0
A whole number from 0 to 100.
Statusdefault NotStarted
AppGanttStatus
NotStarted
Done, InProgress, AtRisk or NotStarted.
Ownerdefault -
string
-
Shown only in the details card.
DependsOndefault -
string list
-
The keys of the rows this one starts after.
Groupdefault -
string
-
The phase the row sits in.
Screen reader
4 notes
Each bar is a focusable list item with one sentence read aloud: its name, dates, percent, status and predecessors.
Arrow keys move between bars. Enter chooses a row (the lanes layout opens its details card) and Escape clears it.
In the table layout the task table has row and column headers, so a screen reader reads each date with its column name.
The zoom is a radio group. The Today flag is text, never colour alone, and status is also written in each bar's label.