On this page
@addTagHelper *, Webority.Ui.RazorLong notes
Use it for a description or note that runs to many lines on a detail page, so the page stays short.
Project notes
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
Short text
Leave the toggle out of short text, since it only appears when the text overflows.
A note that fits
On track.
Every option
Every value of every prop, one cell each.
children: the text to clamp
children: the text or markup
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
lines: how many lines show while collapsed
lines="1"
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
lines="3" (default)
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
lines="10"
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
moreLabel: the toggle while collapsed
more-label="Show more" (default)
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
more-label="Read more"
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
lessLabel: the toggle while expanded
less-label="Show less" (default)
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
less-label="Read less"
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
defaultExpanded: whether it starts open
expanded="false" (default)
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
expanded="true"
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
id: the root's id
id: sets the root id, no visible effect
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
className: classes on the root
class: adds classes to the root (React className)
The tower A fit-out covers the lobby, eleven office floors and the roof terrace. Electrical rough-in is complete on floors one to six; floors seven to eleven wait on the revised panel schedule from the consultant. Painting starts once the false ceiling is signed off, and the lift commissioning is booked for the first week of December. Any change to the finish schedule needs the client's written approval before the vendor orders material, because the tile lead time is eight weeks.
Guidance
What to do, and what to avoid.
Use it when
- A description, note or comment that can run to many lines on a detail page.
Reach for something else when
- Hiding one line of a table cell or title with an ellipsis. → a truncated cell
- Several sections of content that belong behind headings. → AppAccordion
Reference
Try every prop, read the full list, and check keyboard and screen reader behaviour.
4 props. The 3 most used come first.
Used on most screens 3 props
| Prop | Type | Default | Description |
|---|---|---|---|
| linesdefault 3 | int | 3 | How many lines show while the text is collapsed. |
| more-labeldefault Show more | string | Show more | The toggle's text while collapsed. |
| less-labeldefault Show less | string | Show less | The toggle's text while expanded. |
Less common 1 props
| Prop | Type | Default | Description |
|---|---|---|---|
| expandeddefault false | bool | false | Start with the whole text showing. |
Screen reader
3 notes- The clamp is visual: the full text stays in the page for screen readers.
- The toggle is a button that reports aria-expanded and points at the text with aria-controls.
- The toggle shows only when the text overflows, and without script the text shows in full.